Sample-Connections: Feedback modules with integrated occupancy detectors RM-GB-8

The RM-GB-8 is not anymore available.

Please select the successor module RM-GB-8-N.

> To overview: sample connections from not anymore available components and versions
> To overview: sample connections for all available components
> To product description: RM-GB-8

description file edition
Intellibox (2-rail conductor):
Track occupancy feedback with one isolated rail page_017 06/2012
Track occupancy feedback with two isolated rails page_018 06/2012
Numbering the feedback registrations page_028 04/2012
Track monitoring with two booster current circuits (with DB-2) page_255 06/2012
Track monitoring with two booster current circuits (with Power 3) page_145 05/2012
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_345 07/2012
Track section monitoring and switching off (voltage free) page_019 08/2012
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 08/2012
Equivalent current at monitored and non-monitored areas page_496 08/2012
Intellibox (3-rail conductor):
Track monitoring via isolated center conductor page_022 07/2012
Track section monitoring with total isolated track page_023 07/2012
Numbering the feedback registrations page_028 04/2012
Track monitoring with two booster current circuit (with DB-2) page_254 11/2012
Track monitoring with two booster current circuit (with Power 3) page_143 05/2012
TWIN-CENTER (2-rail conductor):
Track monitoring with one isolated rail page_020 04/2012
Track monitoring with two isolated rails page_021 04/2012
Numbering the feedback registrations page_027 04/2012
Track monitoring with two booster current circuit (with DB-2) page_252 06/2012
Track monitoring with two booster current circuit (with TWIN-BOOSTER) page_146 05/2012
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_356 07/2012
Track section monitoring and switching off (voltage free) page_019 08/2012
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 08/2012
Equivalent current at monitored and non-monitored areas page_496 08/2012
Control Unit (6021) Märklin-Digital (3-rail conductor):
Track monitoring with isolated center conductor page_024 04/2012
Track monitoring with total isolated track page_025 04/2012
Numbering the feedback registrations at the Interface page_091 04/2012
Track monitoring with two booster current circuit (with DB-2) page_253 11/2012
Track monitoring with two booster current circuit (with Booster 6015) page_144 05/2012
EasyControl (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_303 07/2013
Track monitoring via isolated center conductor page_305 07/2013
Track section monitoring with total isolated track page_307 07/2013
Track monitoring with two booster current circuits (with DB-2) page_309 07/2013
Numbering the feedback registrations page_310 06/2012
EasyControl (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_302 07/2013
Track occupancy feedback with one isolated rail page_304 07/2013
Track occupancy feedback with two isolated rails page_306 07/2013
Track monitoring with two booster current circuits (with DB-2) page_308 07/2013
Numbering the feedback registrations page_310 06/2012
Track section monitoring and switching off (voltage free) page_019 08/2012
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 08/2012
Equivalent current at monitored and non-monitored areas page_496 08/2012
Accelerated feedback via HSI-88 page_319 07/2013
Accelerated feedback via HSI-88-USB page_471 07/2013
GBS-DEC-s88: external switchboard panel PC-controlled with EasyControl and RM-GB-8 page_484 07/2013
ECoS 2 (50200) (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_1063 10/2012
Track monitoring via isolated center conductor page_1064 10/2012
Track section monitoring with total isolated track page_1065 10/2012
Track monitoring with two booster current circuits (with DB-2) page_1066 11/2012
Numbering the feedback registrations page_1061 10/2012
ECoS 2 (50200) (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_1055 10/2012
Track occupancy feedback with one isolated rail page_1056 10/2012
Shuttle train line with one isolated rail page_1068 10/2012
Track occupancy feedback with two isolated rails page_1057 10/2012
Shuttle train line with two isolated rails page_1069 10/2012
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_1058 10/2012
Track monitoring with two booster current circuits (with DB-2) page_1059 10/2012
Numbering the feedback registrations page_1061 10/2012
Track section monitoring and switching off (voltage free) page_019 08/2012
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 08/2012
Equivalent current at monitored and non-monitored areas page_496 08/2012
ECoS 1 (50000) (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_379 08/2012
Track monitoring via isolated center conductor page_380 07/2012
Track section monitoring with total isolated track page_381 07/2012
Track monitoring with two booster current circuits (with DB-2) page_382 11/2012
Numbering the feedback registrations page_375 07/2012
ECoS 1 (50000) (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_366 07/2012
Track occupancy feedback with one isolated rail page_367 07/2012
Shuttle train line with one isolated rail page_449 07/2012
Track occupancy feedback with two isolated rails page_368 07/2012
Shuttle train line with two isolated rails page_452 07/2012
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_369 07/2012
Track monitoring with two booster current circuits (with DB-2) page_370 07/2012
Numbering the feedback registrations page_375 07/2012
Track section monitoring and switching off (voltage free) page_019 08/2012
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 08/2012
Equivalent current at monitored and non-monitored areas page_496 08/2012
DiCoStation (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_417 11/2012
Track monitoring via isolated center conductor page_418 11/2012
Track section monitoring with total isolated track page_419 11/2012
Track monitoring with two booster current circuits (with DB-2) page_420 11/2012
Numbering the feedback registrations page_413 07/2012
DiCoStation (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_406 09/2012
Track occupancy feedback with one isolated rail page_407 07/2012
Track occupancy feedback with two isolated rails page_408 07/2012
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_409 07/2012
Track monitoring with two booster current circuits (with DB-2) page_410 07/2012
Numbering the feedback registrations page_413 07/2012
Track section monitoring and switching off (voltage free) page_019 08/2012
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 08/2012
Equivalent current at monitored and non-monitored areas page_496 08/2012
Combine existing RM-GB-8 with RM-GB-8-N (1) page_1120 06/2017
Combine existing RM-GB-8 with RM-GB-8-N (2) page_1121 06/2017



Subject to technical changes and errors.
© 2017 by LDT

Märklin and Motorola are registered trade marks.

 
Recent changes RSS feed Creative Commons License Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki Design by Chirripó