Writing /usr/www/users/ldt/newshop2/dokuwiki/data/meta/en/ab_rm_gb_8_nml.meta failed

Sample-Connections: Feedback modules with integrated occupancy detectors RM-GB-8

The RM-GB-8 is not anymore available.

Please select the successor module RM-GB-8-N.

> To overview: sample connections from not anymore available components and versions
> To overview: sample connections for all available components
> To product description: RM-GB-8

description file edition
Intellibox (2-rail conductor):
Track occupancy feedback with one isolated rail page_017 01/2006
Track occupancy feedback with two isolated rails page_018 01/2006
Numbering the feedback registrations page_028 11/2004
Track monitoring with two booster current circuits (with DB-2) page_255 10/2020
Track monitoring with two booster current circuits (with Power 3) page_145 10/2005
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_345 01/2007
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Intellibox (3-rail conductor):
Track monitoring via isolated center conductor page_022 03/2007
Track section monitoring with total isolated track page_023 03/2007
Numbering the feedback registrations page_028 11/2004
Track monitoring with two booster current circuit (with DB-2) page_254 10/2020
Track monitoring with two booster current circuit (with Power 3) page_143 10/2005
TWIN-CENTER (2-rail conductor):
Track monitoring with one isolated rail page_020 11/2004
Track monitoring with two isolated rails page_021 11/2004
Numbering the feedback registrations page_027 11/2004
Track monitoring with two booster current circuit (with DB-2) page_252 10/2020
Track monitoring with two booster current circuit (with TWIN-BOOSTER) page_146 10/2005
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_356 01/2007
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Control Unit (6021) Märklin-Digital (3-rail conductor):
Track monitoring with isolated center conductor page_024 11/2004
Track monitoring with total isolated track page_025 11/2004
Numbering the feedback registrations at the Interface page_091 11/2004
Track monitoring with two booster current circuit (with DB-2) page_253 10/2020
Track monitoring with two booster current circuit (with Booster 6015) page_144 10/2005
EasyControl (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_303 10/2020
Track monitoring via isolated center conductor page_305 10/2020
Track section monitoring with total isolated track page_307 10/2020
Track monitoring with two booster current circuits (with DB-2) page_309 10/2020
Numbering the feedback registrations page_310 07/2006
EasyControl (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_302 10/2020
Track occupancy feedback with one isolated rail page_304 10/2020
Track occupancy feedback with two isolated rails page_306 10/2020
Track monitoring with two booster current circuits (with DB-2) page_308 10/2020
Numbering the feedback registrations page_310 07/2006
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Accelerated feedback via HSI-88 page_319 10/2020
Accelerated feedback via HSI-88-USB page_471 10/2020
GBS-DEC-s88: external switchboard panel PC-controlled with EasyControl and RM-GB-8 page_484 10/2020
ECoS 2 (50200) (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_1063 09/2010
Track monitoring via isolated center conductor page_1064 09/2010
Track section monitoring with total isolated track page_1065 09/2010
Track monitoring with two booster current circuits (with DB-2) page_1066 10/2020
Numbering the feedback registrations page_1061 09/2010
ECoS 2 (50200) (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_1055 09/2010
Track occupancy feedback with one isolated rail page_1056 09/2010
Shuttle train line with one isolated rail page_1068 09/2010
Track occupancy feedback with two isolated rails page_1057 09/2010
Shuttle train line with two isolated rails page_1069 09/2010
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_1058 09/2010
Track monitoring with two booster current circuits (with DB-2) page_1059 10/2020
Numbering the feedback registrations page_1061 09/2010
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
ECoS 1 (50000) (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_379 01/2008
Track monitoring via isolated center conductor page_380 08/2007
Track section monitoring with total isolated track page_381 08/2007
Track monitoring with two booster current circuits (with DB-2) page_382 10/2020
Numbering the feedback registrations page_375 03/2007
ECoS 1 (50000) (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_366 08/2007
Track occupancy feedback with one isolated rail page_367 08/2007
Shuttle train line with one isolated rail page_449 10/2007
Track occupancy feedback with two isolated rails page_368 08/2007
Shuttle train line with two isolated rails page_452 11/2007
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_369 08/2007
Track monitoring with two booster current circuits (with DB-2) page_370 10/2020
Numbering the feedback registrations page_375 03/2007
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
DiCoStation (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_417 10/2020
Track monitoring via isolated center conductor page_418 10/2020
Track section monitoring with total isolated track page_419 10/2020
Track monitoring with two booster current circuits (with DB-2) page_420 10/2020
Numbering the feedback registrations page_413 10/2020
DiCoStation (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_406 10/2020
Track occupancy feedback with one isolated rail page_407 10/2020
Track occupancy feedback with two isolated rails page_408 10/2020
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_409 10/2020
Track monitoring with two booster current circuits (with DB-2) page_410 10/2020
Numbering the feedback registrations page_413 10/2020
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Combine existing RM-GB-8 with RM-GB-8-N (1) page_1120 04/2020
Combine existing RM-GB-8 with RM-GB-8-N (2) page_1121 04/2020


Subject to technical changes and errors.
© 2020 by LDT
Märklin and Motorola are registered trade marks.

 
Recent changes RSS feed Creative Commons License Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki Design by Chirripó